High-quality repairs always end with testing. They are the ones who confirm that the engine is in good working order and ready to work. Let's look at what acceptance tests are carried out after repair.
Why tests are needed
Tests reveal defects before the engine is installed on site. This is a guarantee that after rewinding or repair, the machine will work reliably.
Test checklist
| Test | What it checks |
|---|---|
| Insulation resistance | Insulation quality windings |
| Winding resistance | No open circuit, phase symmetry |
| No-load current | Correct rewinding |
| No-load check | Revolutions, vibration, noise |
| Heating under load | Thermal mode |
| Rotation direction | Correct connection |
What the customer receives
After testing, the responsible service issues a report with the results: insulation resistance, no-load current, speed. These documents confirm the quality of the repair and can be transferred into operation.
Tests are a mandatory part of quality repair. If the engine is delivered without inspection, this is a reason to be wary.