Bearings for electric motors with a rotation speed of 500 - 1500 rpm are selected taking into account their durability and performance - at least 10,000 hours. If the installation, operation and repair of bearings were done correctly, then the service life can be significantly longer. Otherwise, it is quite possible to expect their premature failure. Then the bearings will have to be repaired or replaced.

In order to inspect the bearing, it is necessary to remove the outer and inner capsule cover. Drying and darkening of the lubricant may indicate the need for more frequent replacement. The frequency can be derived based on the operating conditions of the electric motor and the requirements for its reliability.

Features of inspection and replacement

Before inspecting the bearings, they are washed with dehydrated kerosene and wiped with a clean cloth. Next, a direct inspection is carried out. The main attention is paid to the condition of the running tracks of the rings of the rolling elements, the presence of corrosion, the absence of cracks and broken collars. The condition of the separators is also checked - deformations, cracks, riveting quality. Thus, the outer ring of the bearing must rotate absolutely freely by hand (without jamming or unnecessary noise), and the raceways must not have holes, cavities, peeling, matte surfaces, etc. If at least one of the listed defects is detected, the bearing must be replaced.

Need repair consultation?

Contact us — we will calculate cost and completion times.

+998 94 680 15 04 Contact us
Answers to popular questions about this service

Frequently asked questions

The repair time depends on the type: routine repair takes 1-2 days, rewinding takes 3-7 days, and overhaul takes 7-14 days. For urgent orders we work around the clock, and most jobs are completed within 1-3 days.

Yes. We provide a written warranty for all types of work: from 6 months for routine repairs up to 12 months for overhauls and rewinding. The warranty covers factory defects and errors in the repair performed.

Yes. We repair electric motors from any manufacturer — local (AIR, 4A, DAZO) and imported (ABB, Siemens, WEG, Mitsubishi and others). We use original spare parts or high-quality analogues.

Yes, an on-site visit by a diagnostic engineer is available in Tashkent and the Tashkent region. We will assess the motor's condition, perform initial diagnostics and draw up a work plan. The cost of the visit is discussed separately.

In most cases, repair costs 2-4 times less than buying a new motor of similar power. This is especially true for motors above 7.5 kW. See our article "Rewinding or a new motor" for a detailed comparison.

After the repair you receive: a certificate of completed work, a warranty card, and a post-repair test report (insulation resistance, no-load current, RPM). All documents can be handed over to your accounting department for asset registration.