Cement production is the most difficult conditions for engines. We'll tell you how Elektromotors engineers restored a powerful cement plant engine in Tashkent.
Situation
A powerful engine of a cement plant production line failed. Abrasive cement dust clogged the ventilation and got into the bearings, which led to overheating and damage to the winding.
Diagnostics
Diagnostics showed wear of the bearings, contamination and damage to the winding from overheating.
Repair
- Rewindingwith class H insulation.
- Reinforced bearings with dust seals.
- Full cleaning and restoration of cooling.
- Balancing and testing.
Result
The engine was returned to operation with enhanced dust protection. The customer was advised to regularly purge and check the seals. In the cement industry, protection from abrasive dust is the main condition for long-term operation of engines.
Do you need repair of powerful engines at a cement plant in Tashkent? Elektromotors engineers work with heavy equipment - contact us.